The Wild Way · Our project process

Bathroom Remodeling

From a tub conversion to a full bathroom refresh, water management and waterproofing are central to our process.

Wild Construction bathroom renovation with updated vanity and dark wall finishesWild Construction project photo

1. PPE & jobsite safety

  • Safety glasses, gloves, work boots and hearing protection during removal and cutting.
  • Dust containment and hazard-appropriate respiratory protection; use precautions for silica, lead or asbestos where applicable.

2. How we prepare and set up the job

Family-oriented jobsite setup: we review occupied rooms, children and pets, access routes, work hours, dust barriers and where materials will be staged. We explain what will be disrupted before the work starts, and keep affected areas separated from household activity when practicable.

  1. Setup step 1Measure the bathroom and review drainage, ventilation, subfloor and existing moisture concerns.
  2. Setup step 2Protect adjoining floors and isolate the workspace with dust-control barriers.
  3. Setup step 3Arrange water and electrical isolation with qualified trades; check the need for permits and inspections.
  4. Setup step 4Confirm fixture dimensions, shower/tub selection, tile layout and waterproofing system.

3. Step-by-step work process

  1. 1

    Demolition and inspection

    Remove agreed surfaces and fixtures safely, then check exposed framing, subfloor and signs of moisture damage.

  2. 2

    Plumbing and rough work

    Coordinate supply, drain, ventilation, electrical and any framing changes with qualified trades.

  3. 3

    Waterproofing

    Install compatible substrate, shower pan or tub surround and a complete manufacturer-approved waterproofing system.

  4. 4

    Tile, fixtures and finishes

    Install tile or panels, grout and seal as appropriate, then fit fixtures, trim, glass and accessories.

4. Cleanup, quality check & walkthrough

  • Check visible seals, drainage, ventilation and function before closing the job.
  • Remove debris, clean finished surfaces and complete required inspections.
  • Walk through care instructions for grout, sealants, fixtures and ventilation with the customer.

Ready to plan your bathroom remodeling project?

Share photos of the current bath, approximate measurements and whether you want a shower, tub or walk-in tub.

GET A PROJECT ESTIMATECALL (855) 558-0947